SRP-1004
RNA / oligonucleotide
Evidence outlook
Early-stage evidence only
Phase 1 / first-in-human studies establish safety, tolerability, and dosing; they are not designed to demonstrate efficacy, so no evidence signal is assigned yet. The first graded signal arrives with a completed confirmatory readout.
How the evidence outlook works ↗
Featured trials
The studies most instrumental to this drug's clinical progression, individually graded on design and result. The complete registry, including every study not featured here, is listed below.
| Trial | Phase | Endpoint | Key result | Signal | Source |
|---|---|---|---|---|---|
NCT06672445 NCT06672445 · Spinocerebellar Ataxia Type 2 Registry: NCT06672445 | 1 | Number of Participants with Treatment -Emergent Adverse Events (TEAEs) Over Time (Through End of Study (EOS), Day 253) 2026-12 | In progress: results expected 1 Dec 2026 | not yet graded | link ↗ |
All registered studies
Every ClinicalTrials.gov study of this drug's own program. Studies backing a featured trial above are marked Featured; the rest aren't individually graded. Filter by which indication a study was run for, then browse by phase.
Phase 1 (1)
What this study did
Competitive landscape
Other ATXN2 (ataxin-2) drugs
1 other tracked programme targets this mechanism, 1 of them ahead of this one.
| Drug | Stage | Modality | Mechanism | Evidence signal | Reported efficacygraded featured trials | |
|---|---|---|---|---|---|---|
| SRP-1004: this drug | Phase 1 | RNA / oligonucleotide | ATXN2 (ataxin-2) | not yet graded | No reviewed efficacy summary | |
| BIIB105 | Phase 1/2(overall) | RNA / oligonucleotide | Ataxin-2 (ATXN2) mRNA, ATXN2 (ataxin-2) | not yet graded | Featured results are safety only |
Upcoming events
(1 total)
Estimated primary-completion dates from ClinicalTrials.gov. These are registry estimates, never confirmed readout dates; they can move as trials progress.
Follow SRP-1004 to get an email as a readout nears, when a date moves, or when a study changes status. Needs a free account.
Add these readouts to your calendar: Apple or Outlook · Google Calendar · .ics link. The calendar updates when a registry date moves.